UCSD Revelle

Location |
San Diego, CA
Client |
UCSD
Designer |
Completion Date |
2009
Working with the project architects, Hyphae designed the grading and stormwater strategies for dealing with both on-site water management as well as a flash flood stormwater management basement, used to alleviate site-specific upstream campus flooding issues. In addition, Hyphae worked on the waterproofing design for the living roof, as well as the greywater reuse for landscape and interior toilet flushing.
Tags |
none

UCSD Revelle

Location |
San Diego, CA
Client |
UCSD
Designer |
Completion Date |
2009
Working with the project architects, Hyphae designed the grading and stormwater strategies for dealing with both on-site water management as well as a flash flood stormwater management basement, used to alleviate site-specific upstream campus flooding issues. In addition, Hyphae worked on the waterproofing design for the living roof, as well as the greywater reuse for landscape and interior toilet flushing.
Tags |
none

UCSD Revelle

Author |
Story Excerpt:
READ THE STORY ON MEDIUM HERE
Tags |
none
No items found.

Media |
Media Date |
Media Summary:
Tags |
none

UCSD Revelle

Location |
San Diego, CA
Client |
UCSD
Designer |
Completion Date |
2009
Working with the project architects, Hyphae designed the grading and stormwater strategies for dealing with both on-site water management as well as a flash flood stormwater management basement, used to alleviate site-specific upstream campus flooding issues. In addition, Hyphae worked on the waterproofing design for the living roof, as well as the greywater reuse for landscape and interior toilet flushing.
Tags |
none